Operational — Port Said Public Free Zone
Lotus Garments: ~1.14 MWp across five rooftop plants.
Approximately 1.14 MWp across five rooftop plants inside the Port Said Public Free Zone, commissioned in phases during 2024–2025 and managed with coordinated monitoring and maintenance.

Case study
Requirement, role and delivery.
The requirement
A garment manufacturer operating several buildings in a free zone, wanting to add solar as operations grew rather than commit to one large system up front.
IRIS’s role
Engineering, procurement and construction of each plant; low-voltage grid connections; portfolio-wide monitoring and maintenance.
What was delivered
Five rooftop PV plants sized to each building's load, each connected at low voltage, brought into a single monitoring and maintenance regime.
System summary
- Capacity
- ~1.14 MWp combined
- Configuration
- 5 rooftop plants
- Grid connection
- LV, on-grid
- Annual generation
- ~1,930 MWh
- Emissions avoided
- ~1,025 tCO₂/yr
- Commissioned
- Phased, 2024–2025
Design estimate
Estimated from design generation