Lotustex: 5.25 MWp on a single factory rooftop.
A 5.25 MWp solar installation on one factory rooftop, connected to the grid at 11 kV medium voltage and commissioned in January 2026 — the largest industrial rooftop solar project in Egypt.

Case study
Requirement, role and delivery.
The requirement
A textile manufacturer with a large daytime load and a single continuous roof, seeking to reduce exposure to grid tariff increases without interrupting production.
IRIS’s role
Engineering, procurement, construction and grid interconnection; ongoing operation and maintenance including robotic module cleaning.
What was delivered
5.25 MWp of rooftop PV on a single structure, string inverters in a dedicated inverter station, and an 11 kV medium-voltage connection with protection studies accepted by the utility.
System summary
- Capacity
- 5.25 MWp
- Configuration
- Single rooftop
- Grid connection
- 11 kV MV, on-grid
- Annual generation
- ~8,925 MWh
- Emissions avoided
- ~4,730 tCO₂/yr
- Commissioned
- January 2026
Design estimate
Estimated from design generation
Documented result
0%
reduction in energy cost
Basis of calculation
Cost of solar electricity compared with the grid tariff applicable to the site at commissioning, January 2026. Results for other sites depend on tariff, load and system design.


.jpg&w=3840&q=75)

Relevant to your facility?
The solutions behind this project.
Let’s discuss your facility.
Tell us where your site is and what you want to achieve. If you have electricity bills or a load profile available, they help the assessment — you can start the conversation without them.